Sepcification: Working Voltage: 5 to Voltage. Low current consumption: less than20mA, 5V, 2X100mW. Extremely Robust Construction: D30mm X 7.6mm. High-step resolution: 1/12. Directly driven by a -controller Compatiblity: New generation steppers perfectly replace for the XC5.168 and X15.168 X27.168 that are in your cluster from 2001 to 2006,General Motors and cars. Fixed problems like(caused by Motor Stepper): Gauge's sticking, shuttering,chatters,inaccurate, Gauge giving false readings,staying pegging out Gauge dead,etc
CarBole Circuit Tester for 6V / 12V DC Systems Long Probe Continuity Test US Sepcification: Working Voltage: 5 to Voltage. Low current consumption: less than20mA, 5V, 2X100mW. Extremely Robust Construction: D30mm X 7.6mm. High-step resolution: 1/12. Directly driven by a -controller Compatiblity: New generation steppers perfectly replace for the XC5.168 and X15.168 X27.168 that are in your cluster from 2001 to 2006,General Motors and cars. Fixed problems like(caused by Motor Stepper): Gauge's sticking, shuttering,chatters,inaccurate, Gauge giving false readings,staying pegging out Gauge dead,etc 2003 , 2004, 2005, 2006 Izuzu ASCENDER Pontiac AZTEK Chevy AVALANCHE Olds BRAVADA Pontiac BONNEVILLE Chevy CAVALIER (2000, 2001, 2002 - 2006) GMC DENALI GMC ENVOY Cadillac ESCALADE Pontiac GRAND AM Pontiac GRAND PRIX (not 2006) H2 HUMMER Chevy IMPALA ((2000, 2001, 2002 - 2005, not 2006) Buick LESABRE Pontiac MONTANA Chevy MONTE CARLO (not 2006) Buick RAINIER Buick RENDEZVOUS GMC SIERRA Chevy SSR Oldsmobile SIHOUETTE Olds SILVERADO Chevy SUBURBAN Pontiac SUNFIRE (2000, 2001, 2002 - 2006) Chevy TAHOE Chevrolet TRAILBLAZER (2002-2006) Chevy VENTURE GMC YUKON Item Specifics Brand : CarBole Manufacturer Part Number : Does Not Apply Probe Length : 3" Total Length : 8" Ground Wire Length : 4ft Voltage Range : 6V / 12V DC Clamp Capacity : 20 AMP Bulb : 3 Watt Bulb (Replaceable) Warranty : Lifetime UPC : Does not apply
Payment We accept Paypal payment only. Payment should be completed within 4 (Four) days of auction closing. Or unpaid dispute will be filed for closing auction automatically. If for some reason there is any issue with the payment, please contact us, and we will be glad to work with you to resolve any problems.
Shipping All package will be shipped within 1 business day. Please make sure entering correct payment and shipping information before checking out. According to Pricetronic policy, we only ship to Pricetronic ADDRESS. Once your payment is completed, you can leave Pricetronic note or click the button named “contact seller” in your purchase history if the changes are needed before shipping, any fees associated with shipping address should be buyer's responsibility.
Returns All of our items come with a 60-day return policy. We ensure all our items are new and in excellent condition prior to shipping. In the event that you receive the item that is not to the standards above, please contact us via Pricetronic messages. All returns should be shipped with delivery confirmation. Unauthorized returns will not be accepted. If you need to return, please double check to confirm the item not work and contact our customer service representative, let us know the detailed problem and send us some pictures for confirmation.
Contact us Befor purchasing, you can contact us directly by clicking "Ask a Question" at bottom of this page, After purchasing, you can contact us by clicking the button named “contact seller” in your Pricetronic purchase history. All message would be replied within 24 hours(Business day only).
Customer Services
DESCRIPTION
PAYMENT
SHIPPING
RETURN POLICY
CONTACT US
Picture
Store Category USD 14.99 USD 8.95 USD 12.99 USD 9.99 USD 2.24
Hot Item USD 5.99 USD 13.59 USD 6.99 USD 5.99 USD 5.99
Hot Item USD 13.59 USD 5.99 USD 6.99 USD 5.99 USD 5.99
New List Item USD 116.99 USD 8.59 USD 6.99 USD 15.99 USD 6.11
CarBole Circuit Tester for 6V / 12V DC Systems Long Probe Continuity Test US Sepcification: Working Voltage: 5 to Voltage. Low current consumption: less than20mA, 5V, 2X100mW. Extremely Robust Construction: D30mm X 7.6mm. High-step resolution: 1/12. Directly driven by a -controller Compatiblity: New generation steppers perfectly replace for the XC5.168 and X15.168 X27.168 that are in your cluster from 2001 to 2006,General Motors and cars. Fixed problems like(caused by Motor Stepper): Gauge's sticking, shuttering,chatters,inaccurate, Gauge giving false readings,staying pegging out Gauge dead,etc 2003 , 2004, 2005, 2006 Izuzu ASCENDER Pontiac AZTEK Chevy AVALANCHE Olds BRAVADA Pontiac BONNEVILLE Chevy CAVALIER (2000, 2001, 2002 - 2006) GMC DENALI GMC ENVOY Cadillac ESCALADE Pontiac GRAND AM Pontiac GRAND PRIX (not 2006) H2 HUMMER Chevy IMPALA ((2000, 2001, 2002 - 2005, not 2006) Buick LESABRE Pontiac MONTANA Chevy MONTE CARLO (not 2006) Buick RAINIER Buick RENDEZVOUS GMC SIERRA Chevy SSR Oldsmobile SIHOUETTE Olds SILVERADO Chevy SUBURBAN Pontiac SUNFIRE (2000, 2001, 2002 - 2006) Chevy TAHOE Chevrolet TRAILBLAZER (2002-2006) Chevy VENTURE GMC YUKON Item Specifics Brand : CarBole Manufacturer Part Number : Does Not Apply Probe Length : 3" Total Length : 8" Ground Wire Length : 4ft Voltage Range : 6V / 12V DC Clamp Capacity : 20 AMP Bulb : 3 Watt Bulb (Replaceable) Warranty : Lifetime Payment Shipping Returns Contact us Customer Services We accept Paypal payment only. Payment should be completed within 4 (Four) days of auction closing. Or unpaid dispute will be filed for closing auction automatically. If for some reason there is any issue with the payment, please contact us, and we will be glad to work with you to resolve any problems. All package will be shipped within 1 business day. Please make sure entering correct payment and shipping information before checking out. According to Pricetronic policy, we only ship to Pricetronic ADDRESS. Once your payment is completed, you can leave Pricetronic note or click the button named “contact seller” in your purchase history if the changes are needed before shipping, any fees associated with shipping address should be buyer's responsibility. All of our items come with a 60-day return policy. We ensure all our items are new and in excellent condition prior to shipping. In the event that you receive the item that is not to the standards above, please contact us via Pricetronic messages. All returns should be shipped with delivery confirmation. Unauthorized returns will not be accepted. If you need to return, please double check to confirm the item not work and contact our customer service representative, let us know the detailed problem and send us some pictures for confirmation. Befor purchasing, you can contact us directly by clicking "Ask a Question" at bottom of this page, After purchasing, you can contact us by clicking the button named “contact seller” in your Pricetronic purchase history. All message would be replied within 24 hours(Business day only). Copyright of cr-lovedeal. All right reserved.
Powered by SoldEazy
Returns Accepted for this item if it's within 60 Days